The 188th Engineer Combat Battalion was formed at Fort Devens, Massachusetts on September 9th, 1943. The noncommissioned cadre were from the Louisiana maneuver area. The majority of the recruits were from the New England area. Basic training in infantry skills, and combat engineering skills were conducted. At the conclusion of this thirteen week training period you could consider yourself as being on the way to the status of a combat engineer. The battalion conducted maneuvers in the mountains of West Virginia in January and February of 1944. On completion of training there, the battalion was moved to Fort Dix, New Jersey to continue our training in combat engineering skills and techniques.
In the latter part of June, the battalion moved to Camp Shanks New York, to prepare for movement overseas. Shortly before midnight on July 23rd, the battalion boarded The Mauritania along with thousands of other troops, for the movement to England. The Mauritania was one of the premier ships of the Cunard White Star Line. It was the fastest ship of its class in the world. It had a British captain and crew, but the gun crew was composed of American sailors.
We departed the port of New York at 9:15 a.m. on the morning of July 24th. The ship was unescorted as The Mauritania could outrun anything in the German navy. The ship zig-zagged across the Atlantic Ocean arriving at Liverpool on July 31st. Prior to arriving at Liverpool and moving down the Irish Sea, I saw a dark line on the horizon. One of the ships officers was standing nearby. I asked him just what it was and he told me it was the coastline of Ireland, and it was about eight miles away. Sometime later in a letter to my parents, I told them of the sighting. My father in an answering letter said “You saw the coastline of Ireland, and it was eight miles away. Son you have been closer to Ireland than any Riley in the last one hundred and sixty nine years.” My great great grandfather had emigrated to America as a bonded servant at the age of fifteen in 1775.
We left the ship on August 1st and boarded a train for Nantwich, a town in central England. A motor convoy carried the battalion to Duddington Hall, where we were to continue our preparation for combat in France and beyond to who knows where. An Engineer Combat Battalion is highly mechanized, and the next three weeks were spent in acquiring the vehicles, equipment, and tools for the battalion. We had left the states with only our personal weapon. Everything else was left behind. The vehicles were stored at depots like Aintree Race Track. There were vehicles of every classification stored there, and they numbered in the thousands.
In a Combat Engineer Battalion, every squad of a line platoon has a two and one half ton truck for personnel and equipment. Additional vehicles are required for the Supply Sergeant, Company mess personnel, stoves, etc. and various vehicles for officers and others. In all, each line company can have as many as eighteen or more vehicles and trailers. Vehicles for the battalion staff, medical department and supply will add even more to the total required. The channel crossing was made on Sunday August, 27th, and we anchored overnight at Utah Beach in the Cherbourg Peninsula that evening. While in England, we learned that the battalion would be a part of General George Patton’s Third Army. Now that we landed in France, our first job would be to catch up to him, as his army had broken out of the Cherbourg Peninsula and was moving east across France.
We began our movement on August 29th, and as we passed through the town of St. Lo, we could see the damage wrought on that town. There was not one building that had four walls standing. The three or four French civilians that we saw were wandering aimlessly, as there was no place to go. The first day we traveled two hundred and thirty five miles from our departure point. We were out of gas and waited three days for fuel [German gasoline] to continue on our “catch up”. We then traveled another one hundred and sixty miles, arriving at a town near Troyes, France. While stopped there, we had our first encounter with the enemy. A five man reconnaissance patrol from B Company, led by a platoon lieutenant, met a group often or eleven SS troops. The patrol captured three of the enemy, and killed one. We had no casualties from this first encounter with the enemy.
Then the fifth of September, we were on assigned our first job at Joinville, France, on the Upper Mame River. It was the first of many bridges to be built by the Battalion in the months ahead. The damaged bridge was of masonry construction, and the first job was to clear the rubble in the foundation areas, to provide a solid, stable foundation base for the wooden bridge bents to be built at the site. Twenty four inch I beams were to be used as the bridge stringers. Suprisingly, these were found in the local area. The existing masonry piers were utilized after some cleanup and repair. The bridge was completed on September 12th, and placed in service when the 79th Division crossed it with their light tanks, and artillery.
All the material for the two bridges, and canal rerouting were from nearby areas. I tip my “helmet” to the members of these reconnaissance teams that locate acquire and arrange for transporting of this material to the job site. I never was a member of one of those teams, but I know what an important part they play in the success of any construction. The design of the bridge depends on the material they locate. The length of the bridge spans, and the number of stringers per span, and other vital construction items, depends on what they find and deliver.
The Battalion then moved to the Moselle River where the 4th Armored Division had built a tread-way bridge. Our task was to replace this bridge with two bridges, a class 70 and a class 40 bridge. Work started on September 13th as previous reconnaissance by the battalion staff had been completed prior to the arrival of A and C companies, who were to construct the two bridges. A low level timber bridge was to be built along side the recently installed tread-way bridge. A combination of various sizes of I beams were used as there was an insufficient number of any one size for the complete bridge. A trademark of combat engineers is their ability to adapt the design with the materials at hand. The two bridges were completed and ready for traffic at midnight on September 17th.
From September 13th to October 18th the battalion swept two hundred and seven miles of
mined roads, and filled craters, removed road blocks and cleared mine fields. These operations cost the battalion thirteen casualties, and three deaths. The losses were sobering, and caused a change in our tactics of removing mines and anti-personnel devices. All were to be detonated in place when located, no exceptions. We had additional casualties in spite of this. The Germans had ingenious ways of disguising these deadly devices. Most of the casualties we suffered in our activities in Europe, were the result of mines and anti-personnel devices.
The Germans excelled in their use of land mines, and anti-personnel devices. They were ingenious in their placement and disguising of these deadly devices. The German land mine was a finely machined device. The fuses for their land mines were either pressure type, or pressure release type. Both were very effective. The anti-personnel devices were pressure release types. That is, if you stepped on, or a vehicle ran over the triggering device, they exploded with a deadly force when you moved your foot, or the wheel weight was removed as the vehicle moved. Other anti-personnel devices utilized trip wires to detonate them. The most infamous anti-personnel device was a “Bouncing Betty.” When actuated, the explosive charge was elevated to waist height and then exploded. The “Bouncing Betty” was the most feared of all the devices. I have seen, too many times, the crippling, deadly results of their activation.
One of our most catastrophic events with land mines and anti-personnel devices was in the Foret de Haye, between Toul and Nancy, France. This was the site of a German officer training center and proving ground. Imagine the methods of placement and disguising of these mines by German officers, striving for a high mark in their classroom lessons. We had three deadly activations of mines and anti-personnel devices while working in this area, for a total of thirteen casualties. Removal and destroying of these devices was a dangerous job, but it had to be done, and it was the job of the combat engineer to do it.
The Battalion continued to build bridges, repair roads, and all of the other tasks pertinent to being a combat engineer, as we continued to move east across France. Every bridge construction presented new difficulties, but each and every one was solved by the men on the job, and we continued our move east. We had been assigned to support The Fourth Armored Division on our arrival in France, so every bridge job was a “hurry up job”, as the armor was always waiting to cross the river and hammer the enemy. We never kept them waiting too long.
The Battalion continued building bridges across the Moselle River at various locations. As the bridge at Flavigny was nearing completion, heavy rain, which had been falling for a week, caused the river to rise six feet in forty eight hours. This rapid flow of surging water threatened to scour the footings under the bridge bents. There was danger that the bridge might collapse. Work to save the bridge was constant, night and day. The footings were reinforced, and after many hours of anxiety the bridge was saved.
The XII Corps of The Third Army had taken up a defensive position east of Nancy and our drive was stopped. The divisions were rested and re-supplied for the battle yet to come. In early November, while in the Nancy area, word was received that the commanding General, George S. Patton would honor us with a visit. That announcement sure started a commotion. General Patton is well known as an advocate of a full and proper uniform at all times. We had been in France for two months, and not every soldier had a full and complete uniform, especially a necktie. Other items of clothing could be borrowed from another soldier, but each of us only had one tie to start with, and none to lend.
A combat engineer is an ingenious individual, and we soon came up with a solution for the missing neckties. A suitable facsimile could be fashioned with a pair of G I socks. Not a work of art, but it could probably make it in a “walk through” review. It did. General Patton presented Colonel Allen with the Battalion colors, and made a short speech commending us for our performance as a part of the Third Army. We appreciated his visit and his remarks on that occasion.
Early on the morning of November 8th, the artillery illuminated the sky, and we were headed east once again. B company moved to the town of Vie sur Seille where C company constructed a bridge across the Seille River at the town ofChambrey. A company began clearing mines for a bridge at Nomeny, and pile driving began for the bridge. In eight days they had completed a bridge two hundred and twenty five feet in length over the river.
More bridges were constructed on the Saar River, near Diedendorf, Al beschaux, and Neufvillage. Road repairs continued at several locations including damages by bomb craters. B company began construction of a fixed bridge to replace a Bailey bridge at Keskastel. They were within a day of completing the bridge when word was received to stop all construction and prepare to return to the Company area. When I asked about completing the bridge, I was told “your orders are to stop construction and prepare to move out. Some other engineer outfit will complete the bridge, as I doubt that we will ever return to this area. We never did return to this area.
On December 20th we began a bumper to bumper movement of vehicles and personnel -NORTH. We traveled twenty four hours a day, full headlights at night. From time to time we had to move to the side of the road, to permit armored units to pass through us. It seemed that armored units were the ones most wanted first. During one of the stops to permit armored units to pass, I was asked by one of the men where we were headed. I told him that I had not been given that information before our departure. I knew that did not satisfy him. I told him that if we survived this mission, that someday in the future, after the war, we would probably think of this moment as we sat in our rockers, with our favorite libation in hand, and smile. I wonder if he ever did, I know I have.
The seriousness of the German counteroffensive was made known to us at one of the later halts in our movement north. While the Battalion waited at Longuyon France, for one day we were further briefed on the happenings ahead of us, and learned that we were to be assigned to support the Fourth Armored Division in the effort to relieve the units defending Bastogne. That meant we would be in the thick of things, and we were as soon as we arrived.
The Battalion moved from Longuyon to Aubange. A company was to construct a Bailey bridge over the Sure River at Martelange, Belgium. After waiting a day south of the town while the Fourth Armored Division cleared out the Germans, construction began at 7am on the 23rd of December. There were some incoming rounds of mortar fire, but no casualties at the bridge site. The bridge was completed at noon, and placed in service immediately.
For several days there was nothing but fog. The ground combat activities continued, but
all aerial activity was at a standstill. Finally the fog lifted one morning, and the sky was clear. Then we heard the roar of airplane motors. Looking up, we saw the sky was filled with airplanes – Our airplanes. Imagine an expressway, four or five lanes wide in each direction. The first wave of planes were all flying east, literally wing tip to wing tip as we viewed it with the naked eye. We looked up into the sky at the wonderful sight, and shook our fists and cheered like fans at a football game.
The first waves of bombers. Liberators, and B52’s, filled the sky. What a most welcome sight to behold. These were followed by low level bombers and fighter planes that attacked the German lines, that were no more than a hop, skip, and jump from our lines. The German soldier in those positions must surely have thought, “What the hell am I doing here!” These bombing, strafing runs continued from dawn to dusk. The air was continuously filled with planes. One wave coming to punish the Germans and return waves, not as orderly, returning to base for refueling, and reloading of bombs and ammunition for the next trip. What a sight to behold, and one that is indelibly impressed on my mind, for the rest of my life. The odds on the Germans expanding The Bulge must have been shortened as a result of the excellent work of the American and British Air Forces on that day, and the days following.
The American forces defending Bastogne were bolstered by the air drops of supplies by parachute when the skies cleared. Parachutes were of various colors to indicate the type of supplies they were delivering. I am sure some of these parachutes landed in the areas occupied by the German forces. That is understandable because their and our forces were so close. I collected a number of these empty parachutes. The supplies had been removed by the time I reached them. I cut them into smaller sections and mailed them home to my wife. She was an excellent seamstress, and created handkerchiefs, scarves, babushkas, and pillow cases for our family, friends, relatives, and neighbors. So the parachutes went on to a further use after they had done their primary job.
B Company was assigned the mission of out-posting the town ofMartelange. Our platoon was approaching their assigned position at a road intersection north of the town and were challenged, and ordered to halt. Passwords and the usual questions about city and baseball in America. The challenger was satisfied, and we were told to advance. After a few steps, we were once again ordered to halt. It was then that I could see a tank, partially obscured by a small building and a tree. When I looked up at the tank, the muzzle of the gun seemed to be about a foot in diameter, pointing right at me. A voice from within the tank said “I would suggest that you discard or pull up that long coat you are wearing, up to your waist and secure it. Right now you look like a German soldier.” It was far too cold to discard the coat, so I quickly tucked it in at my waist. The next day I traded the long coat for a mackinaw, through the good graces of our supply sergeant. We moved on to our assigned area, and took defensive positions.
At first light a column of American tanks moved down the road toward us, and then stopped as they saw us. An officer in the lead tank asked if we had heard any activity in the town just ahead of us. He was advised that we had heard vehicle movement during the night. With that he ordered the column to move, and it proceeded into the town ofBigonville, Belgium, which was held by the German army. The sounds of battle were soon heard. Sometime later. Fourth Armored Division soldiers were bringing captured German soldiers into our area, where they searched them for weapons, and then assembled them for delivery to a prisoner of war holding area. Our mission was completed and we returned to our company area.
The next day, December 24th, Christmas Eve, the battalion, together with the 249th Engineers, was placed in the line east ofMartelange. The Fourth Armored Division had progressed nearly to Bastogne, and was ready to breech an opening in the German defense. The two engineer battalions were to take the place ofCCR of the Fourth Armored Division, which was to move east, and sweep around the left into Bastogne. Under cover of darkness we moved up on line and began the process of digging in at our defensive positions. The snow was deep, and the night was very cold. Machine guns were set up and bazooka teams were positioned to prevent any breakthrough by German tanks.
All night long the whine of outgoing artillery was heard as they passed over us. But there was no whistle of incoming shells to our defense position. However, there were flares launched into the sky by the enemy. They illuminated the area as if it was daylight. When the flares would burst we froze in place to prevent any detection of our presence. There were no untoward incidents during our stay at our defense position. At noon we
were relieved by elements of the 6th Cavalry Division, and we moved to a rear area, where our cooks had prepared a most welcome Christmas dinner. That Christmas Eve has never been one of my favorite memories when measured against all of the others in my lifetime.
The maneuver by the CCR of the Fourth Armored Division of moving out as we moved in was a successful one. The next day, December 26th, they pierced the Bulge, and the city ofBastogne , and the American soldiers defending it were relieved. Bastogne was important to the German plan because it was at the center of five roads. It was very important to control the city and the five roads in the German plan of attack, to divide the Allied forces. The campaign to stop the German advance was a success, and we were a part of that success. The war moved on as we once again were headed east.
The fighting was fierce and the weather was extremely cold to the point of bitter cold during the month of December. I believe that we accomplished things that none of us thought we were capable of. The German High Command placed the best they had in the line, and we beat them-There was still a lot of fighting ahead of us, but I believe the German High Command realized after their defeat at Bastogne, that the tide of the war had changed, and the Allied Armies would prevail. I believe that they would have surrendered then, rather than suffer the complete destruction of the German homeland. Hitler had nothing to gain by agreeing to a surrender, so the war went on for four more months.
All of this happened sixty nine years ago, and I am now ninety one years old. In retrospect my feelings now, as they were then, are that I am glad that I did not miss it, but I would not want to go through it again.